We’ve completed the installation of durable rubber wheel stops and surface mount bollards, providing superior protection and ensuring compliance with safety standards.
The Australian Standards provides general guidelines for the design, layout, and operation of off-street parking facilities, including recommendations for the installation of bollards.
Revitalising the car park space at Williams Landing, Level 2 with our premier products – P2 Prime, HP1200 and 800TC expertly applied over 3000 square metres.
Unison Brawny – ByN Architectural Car Park Expansion Joint System is an innovative, heavy-duty solution that is both disability certified and easy to install.
Unison Brawny – ByN Architectural Car park Expansion Joint System is an innovative, heavy-duty solution that is both disability certified and easy to install.
Unison Joints supplied Brawny By150N S surface mount car park expansion joint covers for the QIC at Canberra Centre to replace current movement joint systems installed installation was Danlaid Canberra
Existing railing replaced with Ingal Spring Steel Buffas along the perimeter edge. Since the carpark was elevated, anti-climb mesh infill panels were attached to ensure a fully compliant solution.
Unison Joints supplied Brawny By150N S surface mount car park expansion joint covers for the QIC at Canberra Centre to replace current movement joint systems installed installation was Danlaid Canberra
A distinctive car park application for Mirage Doors, working with Woods Bagot Architects and Hutchinson Builders at Aria's "The Standard" Manning St. South Brisbane
Premier Door Systems, a frontrunner in delivering top-notch commercial doors, showcased its dedication to innovation and excellence through a recent collaboration with Multiplex Construction.
Premier Door Systems, a frontrunner in delivering top-notch commercial doors, showcased its dedication to innovation and excellence through a recent collaboration with Multiplex Construction.